Wailea Ekahi renovation

Wailea Ekahi Condo Renovation: Restoring a 1970s Original After Water Damage

This mid-1970s Wailea Ekahi unit had one owner since new and had never been renovated. Two water events, a leak from the unit above and a failed toilet supply line, left it needing a full rebuild. By the time remediation and abatement were complete, demolition had taken the interior well beyond the damaged areas.

The brief: working from the owner's interior designer's plan, keep the unit as close to its original look as possible for the owner's sentimental reasons, while bringing everything behind the walls up to date.

What we did:

- Slab and floors: repaired slab settlement cracks, poured self-leveling underlayment, and installed new laminate flooring throughout.

- Electrical and mechanical: brought accessible electrical up to current code, replaced light fixtures and devices throughout, and installed a new PTAC unit in the primary bedroom, including rebuilding the wall opening.

- Plumbing: updated kitchen, bath and laundry plumbing, and added an electronic water-leak monitoring system so any future leak is caught early.

- Kitchen: custom mahogany cabinets, Silestone countertops, new appliances, sink, disposal, faucet and air gap.

- Bathrooms: new vanity cabinets and countertops, plus a full refresh.

- Finishes: new drywall tape and finish, full repaint, koa wood baseboards, new casing on every interior door, and new door stops.

- Lanai and windows: rebuilt sliding glass door hardware, new insect screens, roll-down lanai shades, and new drapes with blackout panels in the primary bedroom.

Move-in ready handover: we didn't stop at the punch list. We moved the furniture back in, did a full clean, washed linens and clothing, and set up the kitchen so the owner could walk in and start living there that day.

Planning a Wailea or Makena condo renovation, or dealing with water damage? Contact Beacon Construction at (808) 268-8038.

Wailea Ekahi condo kitchen with custom mahogany cabinets and Silestone counters

Remodeled kitchen in a 1970s Wailea Ekahi condo in Wailea, Maui: custom mahogany cabinets, Silestone countertops, new appliances and laminate flooring. General contractor: Beacon Construction.

Kitchen sink and Silestone countertop under garden window, Wailea Ekahi condo

New sink, faucet and Silestone countertop under the garden window in a remodeled Wailea Ekahi condo kitchen, Wailea, Maui.

Galley kitchen with mahogany cabinets and Silestone counters, Wailea Ekahi condo

The original 1970s galley layout, rebuilt with custom mahogany cabinets, Silestone countertops, new appliances and laminate flooring. Wailea Ekahi, Wailea, Maui.

Mahogany cabinets, dishwasher and Silestone counters, Wailea Ekahi condo

Custom mahogany base and upper cabinets with Silestone countertops and a new dishwasher, looking toward the kitchen window. Wailea Ekahi, Wailea, Maui.

Open kitchen with wood bar top and mahogany cabinets, Wailea Ekahi condo

View across the wood bar top into the remodeled kitchen: custom mahogany cabinets, Silestone counters, new appliances and lighting. Wailea Ekahi, Wailea, Maui.

Mahogany kitchen cabinets with pass-through to dining, Wailea Ekahi condo

Custom mahogany cabinets, Silestone countertops and a new dishwasher, with the original pass-through to the dining area kept in place. Wailea Ekahi, Wailea, Maui.

Wood breakfast bar and dining area, Wailea Ekahi condo remodel

Wood breakfast bar under the kitchen pass-through, with new laminate flooring through the dining area. Wailea Ekahi, Wailea, Maui.

Refrigerator framed by tall mahogany pantry cabinet, Wailea Ekahi condo

New French-door refrigerator set into custom mahogany cabinetry, with laminate flooring through the galley. Wailea Ekahi, Wailea, Maui.

Custom mahogany kitchen drawers and cabinet doors, Wailea Ekahi condo remodel

Detail of the custom mahogany base cabinets: drawer stack and shaker-style doors with slim pulls. Wailea Ekahi, Wailea, Maui.

Floating mahogany bathroom vanity with new countertop, Wailea Ekahi condo

Bathroom refresh with a new wall-hung mahogany vanity, countertop, faucet and lighting, plus laminate flooring. Wailea Ekahi, Wailea, Maui.

Mahogany bathroom vanity with new countertop and fixtures, Wailea Ekahi condo

Bathroom refresh: new mahogany vanity cabinet and countertop, faucet, lighting and laminate flooring, with the original shower kept. Wailea Ekahi, Wailea, Maui.

Stacked washer and dryer closet with updated plumbing, Wailea Ekahi condo

Laundry closet with stacked washer and dryer, upgraded supply and drain plumbing and leak monitoring. Wailea Ekahi, Wailea, Maui.

Koa wood baseboard, new door casing and flush access panel, Wailea Ekahi condo

Finish carpentry detail: koa wood baseboard, new interior door casing and a flush-mounted access panel finished to match the wall. Wailea Ekahi, Wailea, Maui.

New PTAC unit in rebuilt wall opening, primary bedroom, Wailea Ekahi condo

Replacement PTAC unit in the primary bedroom, installed after rebuilding the wall opening, with koa baseboard and laminate flooring. Wailea Ekahi, Wailea, Maui.

Electronic water-leak monitoring system controller, Wailea Ekahi condo remodel

After two water events, we added an electronic leak monitoring system so any future leak is caught early. Controller installed in the laundry area. Wailea Ekahi, Wailea, Maui.

Before: Wailea Ekahi condo entry after water-damage demolition

Before: condition of the apartment as received from the water damage remediation specialist. Wailea Ekahi, Wailea, Maui.

Before: hallway with flood cuts and debris, Wailea Ekahi condo

Before: lower drywall cut out during water-damage remediation, with debris still on site. Wailea Ekahi, Wailea, Maui.

Before: living area with flood cuts and stored furniture, Wailea Ekahi condo

Before: living area after water-damage remediation, with the owner's furniture stored on site. Wailea Ekahi, Wailea, Maui.

Before: living room with drying equipment and bare slab, Wailea Ekahi condo

Before: drying equipment, bare slab and stripped walls after the water events, looking toward the kitchen. Wailea Ekahi, Wailea, Maui.

Before: original 1970s kitchen after water-damage demolition, Wailea Ekahi

Before: the original kitchen cabinets and bar, with walls opened and flooring removed after the water events. Wailea Ekahi, Wailea, Maui.

Before: bathroom with vanity removed and walls opened, Wailea Ekahi condo

Before: bathroom after remediation, with the vanity removed and plumbing exposed. Wailea Ekahi, Wailea, Maui.

Before: primary bedroom toward lanai doors after demolition, Wailea Ekahi

Before: bedroom with flooring removed and debris on the slab, looking toward the lanai sliding doors. Wailea Ekahi, Wailea, Maui.

Before: entry door and hallway with flood cuts and air mover, Wailea Ekahi condo

Before: entry with lower drywall removed and drying equipment in place during remediation. Wailea Ekahi, Wailea, Maui.

Before: bathroom tile floor and opened walls, Wailea Ekahi condo

Before: bathroom with the original tile floor, vanity removed and supply lines exposed. Wailea Ekahi, Wailea, Maui.

Before: original closet shelving and tile floor, Wailea Ekahi condo

Before: the original built-in shelving and tile floor, with lower walls opened during remediation. Wailea Ekahi, Wailea, Maui.

Before: hall toward bathroom and kitchen with walls opened, Wailea Ekahi condo

Before: hallway between the bathroom and kitchen after remediation, with lower walls opened and flooring removed. Wailea Ekahi, Wailea, Maui.

In progress: new drywall hung, taped and finished, Wailea Ekahi condo

In progress: walls rebuilt with new drywall, tape and finish, ready for primer and paint. Wailea Ekahi, Wailea, Maui.

In progress: primary bedroom drywall, before PTAC replacement, Wailea Ekahi

In progress: primary bedroom with drywall finished and the old PTAC still in the wall opening, before the slab work and new flooring. Wailea Ekahi, Wailea, Maui.

In progress: new drywall and updated plumbing stub-outs, Wailea Ekahi condo

In progress: drywall finished around the updated plumbing stub-outs, ready for paint and fixtures. Wailea Ekahi, Wailea, Maui.

In progress: living area with new drywall, before flooring, Wailea Ekahi condo

In progress: walls rebuilt and taped, with the slab still bare ahead of crack repair and self-leveling underlayment. Wailea Ekahi, Wailea, Maui.

In progress: painted walls over bare slab before floor prep, Wailea Ekahi condo

In progress: walls finished and painted, with the slab cleaned and ready for settlement-crack repair. Wailea Ekahi, Wailea, Maui.

In progress: living room toward entry, new drywall over bare slab, Wailea Ekahi

In progress: walls closed up and finished, looking toward the entry, before slab repair and new flooring. Wailea Ekahi, Wailea, Maui.

In progress: bathroom with new drywall and paint, Wailea Ekahi condo

In progress: bathroom walls rebuilt and painted, with the toilet removed while plumbing was updated. Wailea Ekahi, Wailea, Maui.

In progress: self-leveling underlayment over repaired slab, Wailea Ekahi condo

In progress: after the slab settlement cracks were repaired, self-leveling underlayment creates a flat base for the new flooring. Wailea Ekahi, Wailea, Maui.

In progress: cured self-leveling floor toward the lanai, Wailea Ekahi condo

In progress: self-leveling underlayment cured and ready for laminate, looking toward the lanai doors. Wailea Ekahi, Wailea, Maui.

In progress: primary bedroom with self-leveling floor, Wailea Ekahi condo

In progress: self-leveling underlayment in the primary bedroom with finished walls masked off; the PTAC opening is under the window. Wailea Ekahi, Wailea, Maui.

In progress: hallway self-leveling floor, walls protected, Wailea Ekahi condo

In progress: hallway with self-leveling underlayment in place and finished walls protected with plastic. Wailea Ekahi, Wailea, Maui.

In progress: PTAC opening under bedroom window, Wailea Ekahi condo

In progress: the PTAC opening under the primary bedroom window with the self-leveling floor finished, before the new unit went in. Wailea Ekahi, Wailea, Maui.

In progress: underlayment for laminate flooring near kitchen, Wailea Ekahi condo

In progress: foam underlayment rolled out over the leveled slab, ready for the laminate install. Wailea Ekahi, Wailea, Maui.

In progress: underlayment along the bedroom wall, Wailea Ekahi condo

In progress: underlayment going down along the wall with laminate planks staged, before the install. Wailea Ekahi, Wailea, Maui.

In progress: laminate planks acclimating before install, Wailea Ekahi condo

In progress: laminate flooring opened and acclimating in the unit before installation over the leveled slab. Wailea Ekahi, Wailea, Maui.

In progress: bedroom doorway before trim and casing, Wailea Ekahi condo

In progress: bedroom doorway before the new door casing and koa baseboard went in, with the leveled floor ready for laminate. Wailea Ekahi, Wailea, Maui.

In progress: louvered closet doors and leveled hallway floor, Wailea Ekahi condo

In progress: original louvered closet doors kept in place, with the hallway floor leveled and ready for laminate. Wailea Ekahi, Wailea, Maui.

In progress: new laminate floor in kitchen before cabinets, Wailea Ekahi condo

In progress: laminate flooring down in the kitchen, with new electrical and plumbing roughed in ahead of the custom mahogany cabinets. Wailea Ekahi, Wailea, Maui.

In progress: wood-look laminate floor in kitchen area, Wailea Ekahi condo

In progress: wood-look laminate installed over the self-leveled slab, ready for kitchen cabinet installation. Wailea Ekahi, Wailea, Maui.

In progress: kitchen flooring with new electrical and plumbing, Wailea Ekahi

In progress: the empty kitchen with new laminate, updated circuits and new plumbing supplies and drain, before cabinets and countertops. Wailea Ekahi, Wailea, Maui.

In progress: living room with new laminate floor and paint, Wailea Ekahi condo

In progress: living room with laminate flooring and paint complete, as furniture starts moving back in. Wailea Ekahi, Wailea, Maui.

In progress: laminate flooring from hallway to bedroom, Wailea Ekahi condo

In progress: continuous laminate flooring from the hall into the bedroom, before baseboard and the new PTAC were installed. Wailea Ekahi, Wailea, Maui.

In progress: final cleanup on new laminate floors, Wailea Ekahi condo

In progress: floors protected and final cleanup underway before furniture returned and the unit was set up move-in ready. Wailea Ekahi, Wailea, Maui.